Power Stations projects

10 projects, 1,505,012 man-hours of recorded site work.

Bars compare man-hours within this sector. Hatched bars are projects still in progress.

Suez 1100 MW Wind Project

Suez 1100 MW Wind Project

Period
Jan 2026 – present
Owner
NREA
Client
POWERCHINA
Man-hours
In progress

Scope of work

  • Supply and erection of aluminium cables with cable joints and termination kits
  • Supply and erection of fiber optic cables
  • Civil excavation of cable trenches and backfilling
West Bakr – Lekela Wind Farm 250 MW

West Bakr – Lekela Wind Farm 250 MW

Period
Apr 2020 – Sep 2021
Owner
NREA
Client
Siemens Gamesa
Man-hours
87,859

Scope of work

  • Supply and erection of aluminium cables with cable joints and termination kits
  • Supply and erection of fiber optic cables
  • Civil excavation of cable trenches and backfilling
Beni Suef Power Station (2 × 1200 MW Combined Cycle)

Beni Suef Power Station (2 × 1200 MW Combined Cycle)

Period
Mar 2016 – Aug 2019
Owner
Middle Egypt Electricity Distribution Co.
Client
Power System Projects (PSP)
Man-hours
859,153

Scope of work

  • Installation of power distribution equipment (main power transformer, MV system (6.3 kV), LV system, stand-by power supply system)
  • Equipment installation (cable system, cable rack and conduit system, grounding and lightning protection system, lighting system)
  • Control equipment installation (process, field, expert, chemical)
  • Instrumentation installation (analyzer system, process system)
  • Electrical auxiliary equipment (TV system, communication system, fire detection system, ventilation and air-conditioning equipment)
  • Installation of electrical systems associated with single machines (storage machines, weigh feeders, hydraulic and lubrication units, dedusting filters, cranes, hoists and lifts, cement silos, packing plant, water treatment plant)
  • Pre-commissioning and commissioning works
EEHC 5 × 2 × 25 MW Fast, Mobile & Flexible Power

EEHC 5 × 2 × 25 MW Fast, Mobile & Flexible Power

Period
May 2015 – Jul 2015
Owner
Egyptian Electricity Holding Company (EEHC)
Client
El Sewedy Electric Distribution & Transmission / General Electric (GE)
Man-hours
40,000

Scope of work

  • Erection of cable ways
  • Laying MV, LV and control cables
  • Termination of MV, LV and control cables
  • Assistance in commissioning activities
Attaqa Power Station (2 × 170 MW Simple Cycle)

Attaqa Power Station (2 × 170 MW Simple Cycle)

Period
Mar 2015 – Dec 2015
Owner
East Delta Electricity Production Co.
Client
Power System Projects (PSP)
Man-hours
250,000

Scope of work

  • Equipment installation
  • Control equipment installation
  • Installation and checking of instrumentation process connections and final control elements
  • Installation of control system
  • DCS/ESD loop checking
  • Installation of operating devices
  • Function test, pre-commissioning and commissioning work
Banha Power Station (750 MW Combined Cycle)

Banha Power Station (750 MW Combined Cycle)

Period
Jul 2013 – May 2014
Owner
Middle Delta Electricity Production Co.
Client
Ansaldo
Man-hours
87,500

Scope of work

  • Equipment installation
  • Control equipment installation
  • Installation and checking of instrumentation process connections and final control elements
  • Installation of control system
  • DCS/ESD loop checking
  • Installation of operating devices
  • Function test, pre-commissioning and commissioning work
  • Supply of all bulk material (trays, ladders, conduits, boxes, etc.)
  • Lighting and earthing system installation
Instrumentation Calibration – Al-Shabab Power Station

Instrumentation Calibration – Al-Shabab Power Station

Period
Feb 2011 – Jul 2011
Owner
West Delta Electricity Production Co.
Client
El-Kharafy National Company
Man-hours
10,500

Scope of work

  • Calibration and loop check for instruments
HRSGs of 750 MW Sidi Krir Combined Cycle

HRSGs of 750 MW Sidi Krir Combined Cycle

Period
May 2009 – Feb 2010
Owner
West Delta Electricity Production Co.
Client
Project Services Co. (PSC)
Man-hours
60,000

Scope of work

  • Equipment installation
  • Control equipment installation
  • Installation and checking of instrumentation process connections and final control elements
  • Installation of control system
  • DCS/ESD loop checking
  • Installation of operating devices
  • Function test, pre-commissioning and commissioning work
  • Supply of all bulk material (trays, ladders, conduits, boxes, etc.)
Nubaria Power Station 2 × 750 MW GTG

Nubaria Power Station 2 × 750 MW GTG

Period
Feb 2005 – Aug 2005
Owner
West Delta Electricity Production Co.
Client
Project Services Co. (PSC)
Man-hours
55,000

Scope of work

  • Electrical equipment installation
  • LV and MV cabling works
  • Lighting and earthing system installation
  • Heat tracing and fire detection system installation
Talkha Power Station

Talkha Power Station

Period
Jul 2005 – Jun 2006
Owner
West Delta Electricity Production Co.
Client
Project Services Co. (PSC)
Man-hours
55,000

Scope of work

  • Electrical equipment installation
  • LV and MV cabling works
  • Lighting and earthing system installation
  • Heat tracing and fire detection system installation