Cement Plants projects

3 projects, 685,000 man-hours of recorded site work.

Bars compare man-hours within this sector. Hatched bars are projects still in progress.

Assiut Cement Factory

Assiut Cement Factory

Period
Feb 2011 – Feb 2012
Owner
Building Material Industry Company (BMIC)
Client
Asec Automation ASA (EPC contractor)
Man-hours
100,000

Scope of work

  • Installation of lighting, fire alarm and lightning systems
  • Cable laying and installation of cable routing system
  • Pre-commissioning and commissioning works
El-Sewedy Cement Factory

El-Sewedy Cement Factory

Period
Feb 2010 – May 2011
Owner
El-Sewedy Cement Company
Client
Asec Automation ASA (EPC contractor)
Man-hours
220,000

Scope of work

  • Installation of lighting, fire alarm and lightning systems
  • Cable laying and installation of cable routing system
  • Pre-commissioning and commissioning works
6,000 TPD Clinker Line – Ramliya

6,000 TPD Clinker Line – Ramliya

Period
Apr 2007 – May 2008
Owner
Arabian Cement Company (ACC)
Client
ESACO S.A.E
Man-hours
365,000

Scope of work

  • Installation of power distribution equipment (main power transformer, MV system (6.3 kV), LV system, stand-by power supply system)
  • Equipment installation (cable system, cable rack and conduit system, grounding and lightning protection system, lighting system)
  • Control equipment installation (process, field, expert, chemical)
  • Instrumentation installation (analyzer system, process system)
  • Electrical auxiliary equipment (TV system, communication system, fire detection system, ventilation and air-conditioning equipment)
  • Installation of electrical systems associated with single machines (storage machines, weigh feeders, hydraulic and lubrication units, dedusting filters, cranes, hoists and lifts, cement silos, packing plant, water treatment plant)
  • Pre-commissioning and commissioning works