10 projects, 981,400 man-hours of recorded site work.

Bars compare man-hours within this sector. Hatched bars are projects still in progress.

Offshore Platform for SUCO Egypt

Offshore Platform for SUCO Egypt

Period
Aug 2015 – Dec 2015
Owner
SUCO Egypt
Client
SUCO Egypt
Man-hours
30,800

Scope of work

  • Cable tray replacement
  • Cable pulling and termination
Assil & Karam Project

Assil & Karam Project

Period
Dec 2013 – Mar 2015
Owner
Badr El Din Petroleum Company (BAPETCO)
Client
Petrojet
Man-hours
425,800

Scope of work

  • Cable laying and termination of power and MV cables
  • Instrumentation activities
  • Installation and checking of instrumentation process connections and final control elements
  • Installation of DCS control system
  • Supply and installation of cable routing system (trays, conduits, etc.)
  • DCS/ESD loop checking
  • Installation of operating devices (junction boxes, local cabinets, air headers)
  • Installation of cables and associated routing
  • Function test, pre-commissioning and assistance in commissioning works
Methanol Tank Area Fire Detection System

Methanol Tank Area Fire Detection System

Period
May 2011 – Jul 2011
Owner
Egyptian Methanex Methanol Company
Client
Petrojet
Man-hours
22,600

Scope of work

  • Supply of fire alarm cables, cable trays, conduits and fire alarm local control panel
  • Installation of fire detectors including cable routing, cable laying and cable termination
  • Pre-commissioning and commissioning work
West El-Ashrafi Onshore Facilities

West El-Ashrafi Onshore Facilities

Period
Jun 2009 – Nov 2010
Owner
Agiba Oil Company
Client
Petrojet
Man-hours
28,200

Scope of work

  • Power and instrument cable laying and termination
  • Installation of cable routing (trays, conduits, etc.)
  • Execution of commissioning and test activities
Maximization of C2/C3 Instrument Works

Maximization of C2/C3 Instrument Works

Period
Nov 2009 – Jun 2010
Owner
Gasco
Client
Petrojet
Man-hours
120,000

Scope of work

  • Installation and checking of instrumentation process connections and final control elements
  • Installation of control system cabinets
  • DCS/ESD loop checking
  • Installation of operating devices, fire alarm devices, junction boxes, etc.
  • Laying and termination of cables and associated routing (trays, conduits, etc.)
  • Function test, pre-commissioning and commissioning works
Fire Detection & Fire Fighting of ELNG Refrigerant Bullets

Fire Detection & Fire Fighting of ELNG Refrigerant Bullets

Period
Apr 2009 – Feb 2010
Owner
Egyptian Liquefied Natural Gas (ELNG)
Client
Egyptian Liquefied Natural Gas (ELNG)
Man-hours
60,000

Scope of work

  • EPCC contract: engineering, procurement, construction and commissioning of the fire detection and fire fighting systems
  • All associated civil, mechanical, electrical and instrumentation works, complete with the necessary calculations and studies
Y1-B & Y2-B Flow Station Offshore Platform

Y1-B & Y2-B Flow Station Offshore Platform

Period
Aug 2008 – May 2009
Owner
El-Khafji Joint Operations / Saudi Oil Company
Client
Petrojet
Man-hours
47,000

Scope of work

  • Electrical system installation (substation equipment, earthing, cabling system, navigation aids, etc.)
  • Instrumentation systems installation (instrument hook-up, calibration, fire detection and alarm, etc.)
  • Power and instrument cable laying and termination
  • Installation of cable routing (trays, conduits, etc.)
  • Execution of commissioning and test activities
Romanah Gas Station

Romanah Gas Station

Period
Feb 2008 – Jun 2008
Owner
North Sinai Gas Station
Client
Global for Technical Services (GTS)
Man-hours
47,000

Scope of work

  • Finishing electrical and instrumentation punch items
  • Pre-commissioning and commissioning works
Saqqara Field Development

Saqqara Field Development

Period
May 2007 – May 2008
Owner
Gulf of Suez Petroleum Company (GUPCO) / BP Egypt
Client
Petrojet
Man-hours
150,000

Scope of work

  • Civil works related to electrical activities (cable trenches, protection tiles)
  • Installation of fire detection equipment
  • Power, instrumentation, fire and data cable laying and termination
  • Function test, pre-commissioning and commissioning works
Fieran Fire Detection & Alarm System

Fieran Fire Detection & Alarm System

Period
Jul 2005 – Dec 2005
Owner
Belayim Petroleum Company (PETROBEL)
Client
Alexandria for Petroleum Maintenance (PETROMAINT)
Man-hours
50,000

Scope of work

  • Installation of fire detection equipment
  • Installation of fire fighting system with related piping, sprinklers and tubing
  • Civil works (trench excavation and concrete foundations)
  • Cable laying and termination, including associated cable trays and conduits
  • System pre-commissioning, commissioning and start-up