Industrial projects

14 projects, 1,561,037 man-hours of recorded site work.

Bars compare man-hours within this sector. Hatched bars are projects still in progress.

FMC New Factory – Borg El Arab

FMC New Factory – Borg El Arab

Period
Sep 2026 – present
Owner
Ferrometalco
Client
Ferrometalco
Man-hours
In progress

Scope of work

  • Electrical works
  • Light current works
SGGE New Expansion RFQ SG and EFS Sites

SGGE New Expansion RFQ SG and EFS Sites

Period
Jan 2026 – present
Owner
Air Liquide
Client
Air Liquide
Man-hours
In progress

Scope of work

  • Supply and installation of cable tray system
Suez Steel Company – RM4

Suez Steel Company – RM4

Period
Dec 2022 – present
Owner
Suez Steel Company
Client
Egyptian Grinding Advanced Technology (EGAT)
Man-hours
In progress

Scope of work

  • Supply of internal lighting works for RM4
  • Supply of fire alarm system for RM4
  • Supply of external lighting system
  • Supply of HVAC works for RM4
  • Supply of RM4 temporary lighting
  • Installation of lighting works for RM4
  • Overhead cranes
  • Erection of external lighting system
  • Erection of fire alarm system for RM4
  • Erection of HVAC system for RM4
  • Erection of RM4 temporary lighting
ELCO Steel Company S.A.E

ELCO Steel Company S.A.E

Period
Apr 2018 – Nov 2019
Owner
ELCO Steel Company S.A.E
Client
ELCO Steel Company S.A.E
Man-hours
440,526

Scope of work

  • Installation and checking of instrumentation and electrical works in the new rolling mill building
  • Supply and erection of rolling mill lighting and fire alarm system
  • Installation of transformer, MV switchgear and LV panels
  • Laying of power, control and fiber optic cables with associated routing such as cable trays and conduits
  • Installation of lighting, fire alarm, CCTV and telephone systems
Suez Steel Factory

Suez Steel Factory

Period
Feb 2012 – Mar 2013
Owner
Suez Steel Co.
Client
Asec Automation
Man-hours
271,000

Scope of work

  • Installation of power distribution equipment (main power transformer, MV system (6.3 kV), LV system, stand-by power supply system)
  • Equipment installation (cable system, cable rack and conduit system, grounding and lightning protection system, lighting system)
  • Control equipment installation (process, field, expert, chemical)
  • Instrumentation installation (analyzer system, process system)
  • Electrical auxiliary equipment (TV system, communication system, fire detection system, ventilation and air-conditioning equipment)
  • Installation of electrical systems associated with single machines (storage machines, weigh feeders, hydraulic and lubrication units, dedusting filters, cranes, hoists and lifts, cement silos, packing plant, water treatment plant)
  • Pre-commissioning and commissioning works
Beet Sugar Plant

Beet Sugar Plant

Period
Mar 2011 – May 2013
Owner
United Sugar Company (SAVOLA)
Client
Hassan Allam Sons (HAS)
Man-hours
150,000

Scope of work

  • Installation of lighting system
  • Installation of low current system
  • Cable laying, termination and installation of cable routing system
Gulsan Project

Gulsan Project

Period
Feb 2013 – Apr 2015
Owner
Gulsan Egypt
Client
Hassan Allam Sons
Man-hours
141,266

Scope of work

  • Installation of lighting system
  • Installation of low current system
  • Cable laying, termination and installation of cable routing system
Al Gawhara Ceramic & Porcelain New Factory

Al Gawhara Ceramic & Porcelain New Factory

Period
Oct 2008 – Sep 2009
Owner
El-Ezz Group
Client
ESACO S.A.E
Man-hours
136,200

Scope of work

  • Installation of LV and MV equipment
  • Cable laying and installation of cable routing
  • Installation of lighting, earthing and lightning systems
  • Installation of low current systems
  • Supply of electrical and low current material
  • Pre-commissioning and commissioning works
Float Glass Plant

Float Glass Plant

Period
Jun 2009 – May 2010
Owner
Sphinx Glass Factory
Client
IANUA SPA
Man-hours
112,800

Scope of work

  • Installation of LV and MV equipment
  • Cable laying, termination and installation of cable routing system
  • Installation of earthing and lightning systems
  • Installation of fire fighting and alarm system
  • Installation of low current system
  • Pre-commissioning and commissioning works
MASAR Engineering Industries Factory

MASAR Engineering Industries Factory

Period
Aug 2011 – Feb 2012
Owner
MASAR Engineering Industries
Client
MASAR Engineering Industries
Man-hours
105,000

Scope of work

  • Design and execution of the factory main building on approximately 1,400 m², a truss steel structure with a 40 m free span supported on 8 m high concrete columns, including all finishing works (masonry, plastering, plumbing, painting, ceramic works, tiles, electrical, etc.)
  • Design and execution of the factory fence and associated buildings (guard room 15 m², prayer room 50 m², canteen 20 m², electrical room 25 m²)
Ezz Steel Factory – El-Sokhna

Ezz Steel Factory – El-Sokhna

Period
Oct 2014 – Apr 2015
Owner
Ezz Steel Co.
Client
Danieli
Man-hours
73,000

Scope of work

  • Provision of electrical and instrumentation construction team, QA/QC inspectors and construction supervisors
ANSDK – New Ladle Furnace (No. 3)

ANSDK – New Ladle Furnace (No. 3)

Period
Jan 2005 – Jul 2005
Owner
Alexandria National Iron & Steel Co.
Client
Projects Services Co. (PSC)
Man-hours
60,000

Scope of work

  • Electrical HV equipment installation (33 kV switchgear, harmonic filter, step-down transformer, etc.)
  • Electrical LV and MV equipment installation (switchgear, MCCs, UPS, etc.)
  • Cabling system installation
  • Lighting and earthing system installation
  • Electrical pre-commissioning and commissioning works
EPIC Fire Fighting for Cranes and Fuel Storage Tanks

EPIC Fire Fighting for Cranes and Fuel Storage Tanks

Period
Apr 2010 – Nov 2011
Owner
Suez Canal Container Terminal (SCCT)
Client
Suez Canal Container Terminal (SCCT)
Man-hours
53,000

Scope of work

  • Engineering, procurement, erection and commissioning of fire alarm and fire fighting systems
  • Erection of fire alarm system in substations and crane rooms
  • Erection of CO2 fire fighting system in substations and crane rooms
  • Erection of foam system for fuel tanks
  • Pre-commissioning, commissioning and start-up
Nubaria Yeast Plant

Nubaria Yeast Plant

Period
Oct 2015 – May 2016
Owner
Lesaffre
Client
Lesaffre
Man-hours
18,245

Scope of work

  • Electrical system installation (substation equipment, earthing, cabling system, navigation aids, etc.)
  • Instrumentation systems installation (instrument hook-up, calibration, fire detection and alarm, etc.)
  • Power and instrument cable laying and termination
  • Installation of cable routing (trays, conduits, etc.)
  • Execution of commissioning and test activities