Accurate Middle East Solutions

4 projects, 260,000 man-hours of recorded site work.

Bars compare man-hours within this sector. Hatched bars are projects still in progress.

ENPPI – Highly Qualified Skilled Manpower

ENPPI – Highly Qualified Skilled Manpower

Period
May 2025 – present
Owner
Aramco, Saudi Arabia
Client
ENPPI
Man-hours
In progress

Scope of work

  • Provision of highly qualified skilled electricians and industrial fitters
Al-Khushaybi Solar PV Park

Al-Khushaybi Solar PV Park

Period
Jan 2025 – present
Owner
Saudi Electricity Company
Client
Larsen & Toubro Saudi Arabia LLC
Man-hours
In progress

Scope of work

  • Low voltage and solar cable pulling in trenches
  • Medium voltage cable pulling and termination
Rabigh Combined Cycle Power Plant

Rabigh Combined Cycle Power Plant

Period
Dec 2024 – present
Owner
Saudi Electricity Company
Client
El Sewedy Power System Projects (PSP)
Man-hours
In progress

Scope of work

  • Cable pulling and termination for the Rabigh project and the existing substation: medium voltage, low voltage, fiber optic, and instrumentation and control cables
Sulaibiya Waste Water Treatment and Reclamation Plant Extension

Sulaibiya Waste Water Treatment and Reclamation Plant Extension

Period
May 2018 – Jul 2020
Owner
Kuwait Ministry of Public Works (MPW)
Client
Mohamed Abdulmohsin Al-Kharafi & Sons (MAK)
Man-hours
260,000

Scope of work

  • Installation of power distribution equipment (main power transformer, MV system (6.3 kV), LV system, stand-by power supply system)
  • Equipment installation (cable system, cable rack and conduit system, grounding and lightning protection system, lighting system)
  • Control equipment installation (process, field, expert, chemical)
  • Instrumentation installation (analyzer system, process system)
  • Electrical auxiliary equipment (TV system, communication system, fire detection system, ventilation and air-conditioning equipment)
  • Installation of electrical systems associated with single machines (storage machines, weigh feeders, hydraulic and lubrication units, dedusting filters, cranes, hoists and lifts, cement silos, packing plant, water treatment plant)
  • Pre-commissioning and commissioning works
  • Installation and checking of instrumentation process connections and final control elements
  • Installation of control system
  • DCS/ESD loop checking
  • Installation of operating devices (junction boxes, local cabinets, air headers)
  • Installation of cables and associated routing
  • Function test, pre-commissioning and assistance in commissioning works