Power Stations Projects

blog image

West Bakr - Lekela Wind Farm 250 MW

Project period : (April. '20) to (Till Now) Total Man-Hours : In progress

Owner

NREA

Client

SIEMENS GAMESA

Scope of work

  • Supply & Erection of aluminium cables along with cable joints and termination kits.
  • Supply & Erection of fiber optic cables.
  • Civil excavation of cable trenching and backfilling
blog image

Beni Swef Power Station ( 2 x 1200MW Combined Cycle )

Project period : (Mar. '16) to (Aug. '19) Total Man-Hours : 859,153.00

Owner

Middle Egypt Electricity Distribution Co.

Client

Power System Projects (PSP)

Scope of work

  • Installation of power distribution equipment (Main power transformer / MV system (6.3KV)/ LV system/stand-by power supply system).
  • Equipment installation (Cable system / Cable rack & Conduit system / Grounding & Lightening protection system / Lighting system ).
  • Control equipment installation (Process / Field / Expert / Chemical).
  • Instrumentation installation ( Analyzer system / Process system ).
  • Electrical auxiliary equipment ( TV system / Communication system / Fire detection system / Ventilation & Air condition equipment ).
  • Installation of electrical systems associated with single machines ( Storage Machines / Weigh feeders / Hydraulic & Lubrication units / Deducting filters / Cranes, Hoists & Lifts / Cement silos / Packing plant / Water treatment plant ).
  • Pre-commissioning and commissioning works.
blog image

EEHC 5 X 2 X 25MW Fast, Mobile & Flex. Power

Project period : (May. '15) to (Jul. '15) Total Man-Hours : 40,000

Owner

Egyptian Electricity Holding Company ( EEHC )

Client

El Sewedy Electric Distribution & Transmission / General Electric (GE)

Scope of work

  • Erection of cable ways.
  • Laying MV, LV & Control Cables.
  • Termination of MV, LV & Control Cables.
  • Assistance in Commissioning activities.
blog image

Attaqa Power Station (2 x 170 MW Simple Cycle)

Project period : (Mar. '15) to (Dec. '15) Total Man-Hours : 250,000

Owner

East delta electrical production CO.

Client

Power System Projects (PSP)

Scope of work

  • Equipment installation.
  • Control equipment installation.
  • Installation and checking of instrumentation process connection & final control element.
  • Installation of control system.
  • DCS / ESD Loop checking.
  • Installation of operating devices.
  • Function test, pre-commissioning and commissioning work.
blog image

Banha Power Station (750 MW Combined Cycle)

Project period : (Jul. '13) to (May. '14) Total Man-Hours : 87,500

Owner

Middle delta electrical production CO.

Client

Ansaldo

Scope of work

  • Equipment installation.
  • Control equipment installation.
  • Installation and checking of instrumentation process connection & final control element.
  • Installation of control system.
  • DCS / ESD Loop checking.
  • Installation of operating devices.
  • Function test , pre-commissioning and commissioning work.
  • Supply of all bulk material such as (trays, ladders, conduits, boxes,... Etc.).
  • Lighting and earthing system installation.
blog image

Instrumentation calibration Al-Shabab Power station

Project period : (Feb.’11) To (Jul.’11) Total Man-Hours : 10,500

Owner

West Delta Electricity Production CO.

Client

El-Kharafy National Company

Scope of work

  • Calibration and Loop check for instruments.
blog image

HRSG’S OF 750 MW SIDI KRIR COMBINED

Project period : (May.’09) To (Feb.’10) Total Man-Hours : 60,000

Owner

West Delta Electricity Production CO.

Client

Project Services CO. (PSC)

Scope of work

  • Equipment installation.
  • Control equipment installation.
  • Installation and checking of instrumentation process connection & final control element.
  • Installation of control system.
  • DCS / ESD Loop checking.
  • Installation of operating devices.
  • Function test , pre-commissioning and commissioning work.
  • Supply of all bulk material such as (trays, ladders, conduits, boxes,... Etc.).
blog image

NUBARIA POWER STATION 2 x 750 MW GTG

Project period : (Feb.’05) To (Aug.’05) Total Man-Hours : 55,000

Owner

West Delta Electricity Production CO.

Client

Project Services CO. (PSC)

Scope of work

  • Electrical equipment installation.
  • LV & MV cabling works.
  • Lighting & earthing system installation.
  • Heat tracing & fire detection system installation.
blog image

Talkha POWER STATION

Project period : (July.’05) To (June.’06) Total Man-Hours : 55,000

Owner

West Delta Electricity Production CO.

Client

Project Services CO. (PSC)

Scope of work

  • Electrical equipment installation.
  • LV & MV cabling works.
  • Lighting & earthing system installation.
  • Heat tracing & fire detection system installation.
Accurate Team
How can we help you?

21 Victor Emmanuel Square, Smouha, Sidi Gaber.
Alexandria - Egypt