Oil & Gas Projects

blog image

Offshore Platform For SUCO Egypt

Project period : (Aug. '15) to (Dec. '15) Total Man-Hours : 30,800

Owner

SUCO Egypt

Client

SUCO Egypt

Scope of work

  • Cable Tray Replacement.
  • Cable Pulling and termination.
blog image

Assil & Karam Project

Project period : (Dec. '13) to (Mar. '15) Total Man-Hours : 425,800

Owner

Badr El Din Petroleum Company (BAPETCO)

Client

Petrojet

Scope of work

  • Cable laying and termination of power and MV cables
  • Instrumentation Activities
  • Installation and checking of instrumentation process connection & final control element
  • Installation of DCS control system
  • Supply &installation of cable routing system (Trays, Conducts,...etc)
  • DCS/ESD Loop checking
  • Installation of operating devices(Junction Boxes / Local Cabinets /Air Headers)
  • Installation of cables and associated routing
  • Function test, pre-commissioning and assistance in commissioning works
blog image

Methanol Tank Area Fire Detection System

Project period : (May. '11) to (July. '11) Total Man-Hours : 22,600

Owner

Egyptian Methanex Methanol Company

Client

Petrojet

Scope of work

  • Supply of fire alarm cables, cable trays, conduits & fire alarm local control panel
  • Installation of fire detectors including cable routing, cable laying and cable termination
  • Pre-commissioning and commissioning work
blog image

West El-Ashrafi Onshore Facilities

Project period : (Jun. '09) to (Nov. '10) Total Man-Hours : 28,200

Owner

Agiba Oil Company

Client

Petrojet

Scope of work

  • Power & Instrument cable laying & termination activities
  • Installation of cable routing (trays,conduits...etc)
  • Execution of commissioning and test activities
blog image

Maximization Of C2/C3 Instrument Works

Project period : (Nov. '09) to (Jun. '10) Total Man-Hours : 120,000

Owner

Gasco

Client

Petrojet

Scope of work

  • Installation and checking of instrumentation process connection & final control element
  • Installation of control system cabinets
  • DCS / ESD loop checking
  • Installation of operating devices, fire alarm devices, junction boxes...etc
  • Laying and termination of cables and associated routing (Trays, Conduits...etc)
  • Function test & pre-commissioning and commissioning works
blog image

Fire Detection & Fire Fighting Of ELNG Refrigerant Bullets

Project period : (Apr. '09) to (Feb. '10) Total Man-Hours : 60,000

Owner

Egyptian Liquefaction Natural Gas

Client

Egyptian Liquefaction Natural Gas

Scope of work

  • EPCC contract to perform the engineering, procurement, construction and commissioning works for the fire detection and fire fighting systems
  • Execution of all the associated civil, mechanical, electrical and instrumentation works complete with the necessary calculation and studios
blog image

YI-B & Y2-B Flow Station Offshore Platform

Project period : (Aug.’08) to (May.’09) Total Man-Hours : 47,000

Owner

El-Khafji Joint Operation /Saudi Oil Company

Client

Petrojet

Scope of work

  • Electrical system installation (substation equipment, earthing, cabling system, navigation aids...etc)
  • Instrumentation systems installation (instruments hook-up, calibration, fire detection & alarm...etc)
  • Power & instrument cable laying & termination activities
  • Installation of cable routing ( trays, conduits...etc).
  • Execution of commissioning and test activities
blog image

Romanah Gas Station

Project period : (Feb.’08) to (Jun.’08) Total Man-Hours : 47,000

Owner

North Sinai Gas Station

Client

Global for Technical Services (GTS)

Scope of work

  • Finishing electrical & instrumentation punch items
  • Pre-commissioning and commissioning works
blog image

Saqqara Filed Development

Project period : (May.’07) to (May.’08) Total Man-Hours : 150,000

Owner

Gulf Petroleum CO. (GUPCO) / BP Egypt

Client

Petrojet

Scope of work

  • Performing of civil works related to electrical activities (cable trenches – protection tiles)
  • Installation of fire detection equipment
  • Power, instrumentation, fire & data cable laying & termination works
  • Function test & pre-commissioning and commissioning works
blog image

Fieran Fire Detection & Alarm System

Project period : (Jul.’05) to (Dec.’05) Total Man-Hours : 50,000

Owner

Belayim Petroleum CO. (PETROBEL)

Client

Alexandria For Petroleum Maintenance (PETROMAINT)

Scope of work

  • Installation of fire detection equipment
  • Installation of fire fighting system complete with related piping, sprinklers & tubing
  • Civil works (trenches excavation & concrete foundation)
  • Laying and termination of cabling works including installation of associated cable trays & conduits
  • System pre-commissioning, commissioning and startup works