Sulaibiya Waste Water Treatment and Reclamation Plant Extension

Project period : (May. '18) to ( Jul. '20 ) Total Man-Hours : 260,000.00

Owner

Kuwait Ministry of Public Work ( MPW )

Client

Mohamed Abdulmohsin Al-Kharafi & Sons ( MAK )

Scope of work

  • Installation of power distribution equipment ( Main power transformer / MV System / LV System /Stand-by power supply system )
  • Equipment installation (Cable system / Cable rack & conduit system / Grounding & lightening protection system / Lighting system )
  • Control Equipment installation ( Process / Field / Expert / Chemical)
  • Instrumentation installation ( Analyzer system / Process system )
  • Installation of Electrical systems associated with single machines (storage machines / weigh feeders / hydraulic & lubrication units / deducting filters / cranes, hoists & lifts / cement silos / packing plant / water treatment plant).
  • Pre commissioning and Commissioning works
  • INSTALLATION AND CHECKING OF INSTRUMENTATION PROCESS CONNECTION & FINAL CONTROL ELEMENT
  • INSTALLATION OF CONTROL SYSTEM
  • DCS/ESD LOOP CHECKING
  • INSTALLATION OF OPERATING DEVICES (JUNCTION BOXES / LOCAL CABINETS / AIR HEADERS)
  • INSTALLATION OF CABLES AND ASSOCIATED ROUTING
  • FUNCTION TEST, PRE-COMMISSIONING AND ASSISTANCE IN COMMISSIONING WORKS