Power Stations

more than 100,000 man-hour

West Bakr - Lekela Wind Farm 250 MW


Total Man-Hours : In progress

 

From : (April. '20) to (Till Now)

Owner : NREA

Client : SIEMENS GAMESA

Scope of work :

• Supply & Erection of aluminium cables along with cable joints and termination kits.
• Supply & Erection of fiber optic cables.
• Civil excavation of cable trenching and backfilling


Beni Swef Power Station ( 2 x 1200MW Combined Cycle )


Total Man-Hours : 859,153.00

 

From : (Mar. '16) to (Till Now)

Owner : Middle Egypt Electricity Distribution Co.

Client : Power System Projects (PSP)

Scope of work :

• Installation of power distribution equipment (Main power transformer / MV system (6.3KV)/ LV system/stand-by power supply system).
• Equipment installation (Cable system / Cable rack & Conduit system / Grounding & Lightening protection system / Lighting system ).
• Control equipment installation (Process / Field / Expert / Chemical).
• Instrumentation installation ( Analyzer system / Process system ).
• Electrical auxiliary equipment ( TV system / Communication system / Fire detection system / Ventilation & Air condition equipment ).
• Installation of electrical systems associated with single machines ( Storage Machines / Weigh feeders / Hydraulic & Lubrication units / Deducting filters / Cranes, Hoists & Lifts / Cement silos / Packing plant / Water treatment plant ).
• Pre-commissioning and commissioning works.


EEHC 5 X 2 X 25MW Fast, Mobile & Flex. Power


Total Man-Hours : 40,000

 

From : (May. '15) to (Jul. '15)

Owner : Egyptian Electricity Holding Company ( EEHC )

Client : El Sewedy Electric Distribution & Transmission / General Electric (GE)

Scope of work :

• Erection of cable ways.
• Laying MV, LV & Control Cables.
• Termination of MV, LV & Control Cables.
• Assistance in Commissioning activities.


Attaqa Power Station (2 x 170 MW Simple Cycle)


Total Man-Hours : 250,000

 

From : (Mar. '15) to (Dec. '15)

Owner : East delta electrical production CO.

Client : Power System Projects (PSP)

Scope of work :

• Equipment installation.
• Control equipment installation.
• Installation and checking of instrumentation process connection & final control element.
• Installation of control system.
• DCS / ESD Loop checking.
• Installation of operating devices.
• Function test , pre-commissioning and commissioning work.


Banha Power Station (750 MW Combined Cycle)


Total Man-Hours : 87,500

 

From : (Jul. '13) to (May. '14)

Owner : Middle delta electrical production CO.

Client : Ansaldo

Scope of work :

• Equipment installation.
• Control equipment installation.
• Installation and checking of instrumentation process connection & final control element.
• Installation of control system.
• DCS / ESD Loop checking.
• Installation of operating devices.
• Function test , pre-commissioning and commissioning work.
• Supply of all bulk material such as (trays, ladders, conduits, boxes,... Etc.).
• Lighting and earthing system installation.


Instrumentation calibration Al-Shabab Power station


Total Man-Hours : 10,500

 

From : (Feb.’11) To (Jul.’11)

Owner : West Delta Electricity Production CO.

Client : El-Kharafy National Company

Scope of work :

• Calibration and Loop check for instruments.

HRSG’S OF 750 MW SIDI KRIR COMBINED


Total Man-Hours : 60,000

 

From : (May.’09) To (Feb.’10)

Owner : West Delta Electricity Production CO.

Client : Project Services CO. (PSC)

Scope of work :

• Equipment installation.
• Control equipment installation.
• Installation and checking of instrumentation process connection & final control element.
• Installation of control system.
• DCS / ESD Loop checking.
• Installation of operating devices.
• Function test , pre-commissioning and commissioning work.
• Supply of all bulk material such as (trays, ladders, conduits, boxes,... Etc.).


NUBARIA POWER STATION 2 x 750 MW GTG


Total Man-Hours : 55,000

 

From : (Feb.’05) To (Aug.’05)

Owner : West Delta Electricity Production CO.

Client : Project Services CO. (PSC)

Scope of work :

Electrical and instrumentation works of on-skid gas turbine package such as:

• Electrical equipment installation.
• LV & MV cabling works.
• Lighting & earthing system installation.
• Heat tracing & fire detection system installation.


Talkha POWER STATION


Total Man-Hours : 55,000

 

From : (July.’05) To (June.’06)

Owner : West Delta Electricity Production CO.

Client : Project Services CO. (PSC)

Scope of work :

Electrical and instrumentation works of on-skid gas turbine package such as:

• Electrical equipment installation.
• LV & MV cabling works.
• Lighting & earthing system installation.
• Heat tracing & fire detection system installation.