Power Stations


more than 100,000 man-hour
Total Man-Hours : In progress
|
|
 |
From : (April. '20) to (Till Now)
|
Owner : NREA
|
Client : SIEMENS GAMESA
|
Scope of work :
|
• Supply & Erection of aluminium cables along with cable joints and termination kits.
• Supply & Erection of fiber optic cables.
• Civil excavation of cable trenching and backfilling
Total Man-Hours : 859,153.00
|
|
 |
From : (Mar. '16) to (Till Now)
|
Owner : Middle Egypt Electricity Distribution Co.
|
Client : Power System Projects (PSP)
|
Scope of work :
|
• Installation of power distribution equipment (Main power transformer / MV system (6.3KV)/ LV system/stand-by power supply system).
• Equipment installation (Cable system / Cable rack & Conduit system / Grounding & Lightening protection system / Lighting system ).
• Control equipment installation (Process / Field / Expert / Chemical).
• Instrumentation installation ( Analyzer system / Process system ).
• Electrical auxiliary equipment ( TV system / Communication system / Fire detection system / Ventilation & Air condition equipment ).
• Installation of electrical systems associated with single machines ( Storage Machines / Weigh feeders / Hydraulic & Lubrication units / Deducting filters / Cranes, Hoists & Lifts / Cement silos / Packing plant / Water treatment plant ).
• Pre-commissioning and commissioning works.
Total Man-Hours : 40,000
|
|
 |
From : (May. '15) to (Jul. '15)
|
Owner : Egyptian Electricity Holding Company ( EEHC )
|
Client : El Sewedy Electric Distribution & Transmission / General Electric (GE)
|
Scope of work :
|
• Erection of cable ways.
• Laying MV, LV & Control Cables.
• Termination of MV, LV & Control Cables.
• Assistance in Commissioning activities.
Total Man-Hours : 250,000
|
|
 |
From : (Mar. '15) to (Dec. '15)
|
Owner : East delta electrical production CO.
|
Client : Power System Projects (PSP)
|
Scope of work :
|
• Equipment installation.
• Control equipment installation.
• Installation and checking of instrumentation process connection & final control element.
• Installation of control system.
• DCS / ESD Loop checking.
• Installation of operating devices.
• Function test , pre-commissioning and commissioning work.
Total Man-Hours : 87,500
|
|
 |
From : (Jul. '13) to (May. '14)
|
Owner : Middle delta electrical production CO.
|
Client : Ansaldo
|
Scope of work :
|
• Equipment installation.
• Control equipment installation.
• Installation and checking of instrumentation process connection & final control element.
• Installation of control system.
• DCS / ESD Loop checking.
• Installation of operating devices.
• Function test , pre-commissioning and commissioning work.
• Supply of all bulk material such as (trays, ladders, conduits, boxes,... Etc.).
• Lighting and earthing system installation.
Total Man-Hours : 10,500
|
|
 |
From : (Feb.’11) To (Jul.’11)
|
Owner : West Delta Electricity Production CO.
|
Client : El-Kharafy National Company
|
Scope of work :
|
• Calibration and Loop check for instruments.
Total Man-Hours : 60,000
|
|
 |
From : (May.’09) To (Feb.’10)
|
Owner : West Delta Electricity Production CO.
|
Client : Project Services CO. (PSC)
|
Scope of work :
|
• Equipment installation.
• Control equipment installation.
• Installation and checking of instrumentation process connection & final control element.
• Installation of control system.
• DCS / ESD Loop checking.
• Installation of operating devices.
• Function test , pre-commissioning and commissioning work.
• Supply of all bulk material such as (trays, ladders, conduits, boxes,... Etc.).
Total Man-Hours : 55,000
|
|
 |
From : (Feb.’05) To (Aug.’05)
|
Owner : West Delta Electricity Production CO.
|
Client : Project Services CO. (PSC)
|
Scope of work :
|
Electrical and instrumentation works of on-skid gas turbine package such as:
• Electrical equipment installation.
• LV & MV cabling works.
• Lighting & earthing system installation.
• Heat tracing & fire detection system installation.
Total Man-Hours : 55,000
|
|
 |
From : (July.’05) To (June.’06)
|
Owner : West Delta Electricity Production CO.
|
Client : Project Services CO. (PSC)
|
Scope of work :
|
Electrical and instrumentation works of on-skid gas turbine package such as:
• Electrical equipment installation.
• LV & MV cabling works.
• Lighting & earthing system installation.
• Heat tracing & fire detection system installation.